Bathroom tile failures are almost always caused by substrate problems — moisture, movement, or improper prep. Documenting the substrate before any tile goes down is your protection. Here's what to photograph.
Before tile: Cement board condition, waterproofing membrane coverage (especially in wet areas — shower pan and walls), flatness test, and any existing cracks or concerns.
During installation: Mortar bed, layout lines, first tile set as reference.
After installation: Completed tile and grout, all surfaces including shower niche and floor/wall transitions.
TimeFotos keeps all installation photos by address with automatic timestamps. Share one link with the client or contractor. Create your free tile contractor listing → · timfotos.com/pricing. Start free →